The Engineering Behind Moving Water Uphill and Against System Pressure

Pumping projects may seem easy on paper. Water arrives at a specific location and needs to reach another. In practice the distance between these two points may be subject to changes in rate of flow, elevation differences, solids, pressure requirements, storage capacity, and electrical equipment, access to maintenance and restrictions on the site.

For Romtec Utilities, designing an infrastructure for pumping begins with specifying the operational conditions instead of selecting the equipment from a catalog. Then, the initial designs and budgetary requirements can be designed based on what the requirements of the project are.

Image credit: romtecutilities.com

Start With One Question How are We Moving?

The technology changes instantly.

There are significant variations in the flow rate of the domestic sewage. The wastewater lift station will be required when gravity conveyance is not or does not work. Engineers need to consider the expected inflow and the conditions of peak, pumping capacity and wet-well behavior, discharge specifications, and the way in which equipment is maintained and operated.

Diverse challenges arise from industrial water. A processing or manufacturing facility could require moving high-temperature, caustic, oily or high-pressure liquids. Romtec Utilities designs systems for industrial applications that range from food processing and power generation, databases, pharmaceutical waste, petroleum and gas facilities.

Rainfall creates a completely different operating environment

Stormwater systems tend to be unoccupied for prolonged periods of time but then suddenly they face an enormous volume of water during a storm.

For example, a stormwater lift station with a basin of detention is required to be in line with the drainage plan of the site. The water that flows through the basin for detention, and the temporary storage system manages immediately the volume and the pumping system moves the collected water to a designated discharge point.

Romtec Utilities provided this solution to develop a Norco business park in California. The development needed a pumping station to empty a detention system into the public stormwater drainage network. The station therefore had be designed as part of the development’s drainage infrastructure rather than treated as a separate piece of equipment.

“Package” Doesn’t Have to Be Off-the-Shelf

A common misconception is that a package pumping system is simply a predetermined collection of components.

Packaging can be used to integrate the main elements of a system that is designed for a specific project. Pumps, meters and controls along with structural elements and other equipment, are able to be picked depending on the needs of the.

This strategy is particularly beneficial when a new system must connect with existing infrastructure. Municipal and industrial plants facilities rarely offer unlimited space or even clean installation conditions. Equipment might need to be positioned around existing piping, structures as well as electrical systems and operating schedules.

Capacity Planning Can Have Real Consequences

The cost of undersizing is particularly high when facilities expand.

Romtec Utilities, a Portland International Airport utility company, has designed and constructed a sewer interceptor lifting station to the PDX Next project. The new station is planned to increase the capacity at peak flows of the existing system, as airport facilities expand.

This is a great illustration of a fundamental engineering concept: Design conditions shouldn’t be restricted to what a facility can handle on an average afternoon. Engineers must also understand what happens when demand is at its highest.

The Job Isn’t Finished When the Equipment arrives

Then, drawings and calculations must be converted into an operating system. Installation coordination, startup, testing documentation, and operator understanding all contribute to the long-term success of.

What happens following the installation of a pumping system determines its quality. The decisions taken during the initial design phase are evident when flows increase or major storms are triggered or maintenance is required.

Romtec Utilities incorporates these options into a pumping system that is tailored to the project. This helps transform individual equipment into an infrastructure designed for the conditions they will have to face.